Fahrush Azemi

Fahrush Azemi

Member

Nr.kontaktues:

//

Email: //

Proposed position for the contract:

1.       NAME:                                Fahrush Azemi

2.       DATE OF BIRTH:                 01/01/1974                                               

3.       NATIONALITY:                    Kosovo

4.       PROFESSION:                    Energy & Sustainability Expert

5.       DEGREES:.

Dates (from - to)

University / Institution

Degree(s) or diploma(s) obtained

2011-2013

Polis University, Tirana & IHS Institute, Rotterdam – ERASMUS Program

 

Urban Design and landscape

Professional master

1993-2004

Architect Engineer; 10/1993- 7/2004, University of Pristina, Faculty of Engineering and Architecture – Kosovo

 

Dipl. eng. Architect.

later converted to a

 Master of Science in Architecture

6.

Certificates and licence

Time Period

University / College / Institute

 

2022-2017

EIA Reports licensed by MESP, (individual and company`s license)

 

December 2020

Certificate of Energy Auditor- GIZ Germany and QEQ

 

2015-2017

Energy auditor, INDUSTRIAL BUILDING Cert by EBRD,

 

 

2023

Professional license in the field of Cultural Heritage NOU 0010-24.01.2023

 

2020

Health and safety certificate (Unops)

 

2022

UKATA - Certificate of training Asbestos Awareness-Cert.no: 1880177 14th May 2022.

 

2011-2012

Urban Sustainable Planning & Development Training Program
IHS – Institute for Housing and Urban Development Studies, Erasmus University Rotterdam
February 3 – October 7, 2012 | Tirana, Albania
Completed a series of training courses in Sustainable Urban Planning and Development as part of the MA TRA Program, supported by the Ministry of Foreign Affairs of the Netherlands.

 

2008

Technical Training Certificate – Advanced HVAC Systems
Kyung Dong Navien Co., Ltd. & Samsung
2008 | Seoul, South Korea
Received certification for completing advanced technical training in HVAC systems.

 

 

Software tools for energy performance analysis.

 

 

Encape - Enscape Impact automatically detects and analyzes data from your project’s geometry to provide energy performance insights. Enscape Impact, developed in partnership with global climate tech company IES, is a brand-new add-on designed to seamlessly integrate real-time rendering with building performance metrics. It empowers you to optimize building performance and sustainability directly within your workflow to enhance your creative vision.

https://enscape3d.com/impact/

 

 

Ubakus I Software (Online) Tool to calculate U-values, thermal insulation, moistore protection and heat protection, other building physics issues starting from a large material library. https://www.ubakus.de/about/

 

 

LANGUAGES:

Language

Reading

Speaking

Writing

Albanian

Native

Native

Native

English

Proficient

Proficient

Proficient

Serbian/Croatian

Fluent

Fluent

Fluent

           

7.       OTHER SPECIAL SKILLS: 

  • Licensed architect by the Chamber of Architects of Kosovo - Licence number: A-0238

 

  • Overall professional experience in Architecture and Construction, Energy Efficiency, Environmental & Social Impact Assesment (ESIA). Sustainable Urban Design.
  • Experience working as a lecturer at ESLG College, where he has taught in the bachelor’s study programs Management of Real Estate and Infrastructure and Energy Management. His teaching has focused on the following courses:

- Sustainable Architecture

- Sustainable Urban Design

- Sustainable Building Design

                       - Sustainable Refurbishment

  • The founder and Executive Director of the Kosovo Green Building Council (KGBC) and a passionate advocate for green buildings with high energy performance, actively contributing to raising awareness and promoting sustainable practices in the construction sector in Kosovo.

8.       CURRENT PROFESSIONAL SITUATION:                 

  • Employed: AEK + Tempoenergy SH.P.K. Managing Director
  • KGBC - Executive Director, KGBC- Kosovo Green Building Council - est. September 2024 (NGO)

9.        YEARS OF EXPERIENCE: Over 24 years of work experience.

10.     SPECIFIC PROFESSIONAL EXPERIENCE RELEVANT TO THE CONTRACT:

Dates (From - To)

Client

Description Of the Contract/Mission

Tasks And Responsibilities

March 2025 – ongoing

Model Slovenia SHPK

Reference:  Afrim Tafa – Drejtor

Mob: 0038348545554

[email protected]

 

Architect-Manager

 

Assignment:

Residential Apartment complex, 12,000.00 m2, “MAT1”, Prishtinë.

Description of services: The design of the entire complex with all architectural phases: architectural, structural calculation, water and sewage installations, electricity, HAVC, building physics. as well as obtaining building permit in the Prishtina Municipality.

 

MUNICIPAL ENVIRONMENTAL PERMIT REPORT.

Legal basis for drafting the

report; Work methodology; Description of location and environmentbaseline; Description of the buildings and technological process; Environmental impact report for municipal environmental permit; Air pollution, Water pollution, Soil pollution, Noise, Effects on

 

Januar 2025 ongoing

Model Slovenia Invest

Reference:  Shpetim Memishi – Manager

Mob: 0038349654131

[email protected]

 

Architect-Manager

 

Assignment:

Residential Apartment complex, 31,000.00 m2, “Kalabri”, Prishtinë.

Description of services: The design of the entire complex with all architectural phases: architectural, structural calculation, water and sewage installations, electricity, HAVC, building physics. as well as obtaining building permit in the Prishtina Municipality.

 

MUNICIPAL ENVIRONMENTAL PERMIT REPORT.

Legal basis for drafting the

report; Work methodology; Description of location and environmentbaseline; Description of the buildings and technological process; Environmental impact report for municipal environmental permit; Air pollution, Water pollution, Soil pollution, Noise, Effects on

 

August

2024

The Kosovo Energy Efficiency Fund - KEEF

Energy auditor

Assignment:

 

Cert.no.18. Public Calls 2024

Kosovo Energy Efficiency Fund announces a Public Call for implementation of the Emergency Project “Implementation of energy efficiency measures for individual residential houses”

Audit of more than 10 individual houses that have benefited from subsidies

 

Januar 2021- September 2022

Model Slovenia Invest

Reference:  Shpetim Memishi – Manager

Mob: 0038349654131

[email protected]

 

Architect-Manager

 

Assignment:

Residential Apartment complex, 22,000.00 m2, “MAT1”, Prishtinë.

Description of services: The design of the entire complex with all architectural phases: architectural, structural calculation, water and sewage installations, electricity, HAVC, building physics. as well as obtaining building permit in the Prishtina Municipality.

 

MUNICIPAL ENVIRONMENTAL PERMIT REPORT.

Legal basis for drafting the

report; Work methodology; Description of location and environmentbaseline; Description of the buildings and technological process; Environmental impact report for municipal environmental permit; Air pollution, Water pollution, Soil pollution, Noise, Effects on

 

Januar 2021- September 2022

Model Slovenia

Reference:  Afrim Tafa – Drejtor

Mob: 0038348545554

[email protected]

 

Architect-Manager

 

Assignment:

Residential Apartment complex, 16,000.00 m2, “Kalabri”, Prishtinë.

Description of services: The design of the entire complex with all architectural phases: architectural, structural calculation, water and sewage installations, electricity, HAVC, building physics. as well as obtaining building permit in the Prishtina Municipality.

 

MUNICIPAL ENVIRONMENTAL PERMIT REPORT.

Legal basis for drafting the

report; Work methodology; Description of location and environmentbaseline; Description of the buildings and technological process; Environmental impact report for municipal environmental permit; Air pollution, Water pollution, Soil pollution, Noise, Effects on

 

July - August  2024

 

F.C. Pristina Reference:

Reference: Arton Osmani- director

 

Project manager, architect

Types of activities:

 

Architect for the second phase of the conceptual and detailed design for the construction of the training camp for the Football Club Prishtina.

 

July - August  2024

 

F.C. Pristina Reference:

Reference: Arton Osmani- director

 

 

Environmental Expert

 

Types of activities:

 

The preparation of the report for the Environmental Permit for the sports facilities of the "Prishtina" Football Club, including: the stadium with changing rooms and stands, the auxiliary fields, the hotel, and other auxiliary spaces in a total area of: S=100,000.00 m²

 

March-Jun

2024

 

EBE Energy SH.P.K.

Reference: Festim Syla-manager Email: [email protected]

 

Environmental Expert

 

Types of activities:

 

Preparation of the Environmental Impact Assessment (EIA) report for the 3 MW "Mjellma 2" solar park project in Shtime by the investor EBE Energy. The service included the drafting of the EIA report, conducting the public discussion, and obtaining the environmental consent from the Ministry of Environment and Spatial Planning.

 

June -August

2024

 

RAFFI SH.P.K.

Reference: Ehat Bytyqi Tel.no: 00383 44 506 037

 

Energy auditor

Types of activities:

 

Feasibility study of 135 MW solar farm in Cermjan-Gjakova, for the investitor RAFI Sh.P.K.

ESIA,Technical Analysis. Site Suitability, Solar Resurce Assessment, Pawer Demand Assumptions, System design, Performance Analysis, Cost Analysis, Financial IncentivesReturn on Investment.

 

Januar 2023- September 2024

Limit Project Sh.P.K.

Reference:  Lulzim Zaraj – Owner

Mob: 00383 45 401 976

[email protected]

 

Architect-Manager

Environmental expert

 

Assignment:

 

Residential Apartment complex, 15,000.00 m2, “Prishtina e Re”, Prishtinë.

Description of services: The design of the entire complex with all architectural phases: architectural, structural calculation, water and sewage installations, electricity, HAVC, building physics. as well as obtaining building permit in the Prishtina Municipality.

 

MUNICIPAL ENVIRONMENTAL PERMIT REPORT.

Legal basis for drafting the

report; Work methodology; Description of location and environmentbaseline; Description of the buildings and technological process; Environmental impact report for municipal environmental permit; Air pollution, Water pollution, Soil pollution, Noise, Effects on

 

June/ 2023-

Sep/ 2023

 

Kosovo Energy Corporation - KEK

Reference: Donjeta Sgogojeva, Project Manager,

email:[email protected];

tel:+38344229106

 

 

AEK group SH.P.K & Lorenco SH.P.K.

Lead ESIA

 

Assignment:

 

Environmental and Social Impact Assessment (ESIA) for the solar PV plant “Kosova A” 100MW.

 

Types of activities:

 

 

Mobilisation of a team of qualifies experts to undertake ESIA studies. Describe the applicable regulatory requirements and related administrative processes- approval procedure, To propose a stakeholder Engagement Plan (SEP). Prepare an updated version of the Environmental and Social Management Plan (ESMP); Baseline assessment and Impact Analyses related to M&S aspects of Preconstruction and Construction, operation, Decommissioning and Project closure. ESMMP; Public consultation; To support KEK in submitting that eSIA material to the Kosovo Authorities responsible for Environmental permits according to the national regulations in force. Compile, edit and prepare drafts and final versions of project.

 

Aug /2023

The Kosovo Energy Efficiency Fund (KEEF)

Mob:038 223 776

Energy auditor – individual

 

Assignment:

 

Public Calls 2023

 

Types of activities:

 

Kosovo Energy Efficiency Fund announces a Public Call for implementation of the Emergency Project “Implementation of energy efficiency measures for individual residential houses”

Audit of more than 30 individual houses that have benefited from subsidies

 

March/2023-

Jan/2024

 

PLANET and consortium

Western Balkans Investment Framework    WBIF) - Infrastructure Project Facility  Technical Assistance 10 (IPF 10), Infrastructures: Energy, Environment, Social, Transport and Digital economy

 

Reference:

Dimitris Galanis

Head of Intl Department [email protected]

Spatial  planning expert

 

Assignment:

 

Assessment of the potential to deliver utility-scale dispatchable renewable power to Kosovo – Component

 

Types of activities:

The third phase of technical assistance on this matter (KOS RES III) is envisaged to support the Kosovo Ministry of Economy in implementing the strategic goals concerning RES capacity targets. The work in this phase should include the following tasks:

  • Expand the assessment performed in KOS RES II to include suitable publicly owned forested areas.
  • Prepare modifications of spatial planning documentation to designate identified locations for RES development.
  • Further, analyse the selected locations to prepare those for concession tendering.

The TOR for this project provides the necessary combination of technical, environmental and social, legal, and spatial planning aspects covering a wide variety of issues related to the planning and development of renewable energy projects

 

Oct /2021-

Mar/ 2024

PLANET and Consortium

Western Balkans Investment Framework    WBIF) - Infrastructure Project Facility  Technical Assistance 10 (IPF 10), Infrastructures: Energy, Environment, Social, Transport and Digital economy

 

 

Reference:

Dimitris Galanis

Head of Intl Department [email protected]

 

 

LEAD ESIA

Assignment:

 

Kosovo, District Heating Systems: Feasibility Study, ESIA. Western Balkans Investment Framework (WBIF)

 

Type of services:

 

The Study covers (9 municipalities) the regions of: Gjilan, Ferizaj, Drenas, Obiliq, Peja, Prizren, Mitrovica, Mitrovica North Zveqan.

The Feasibility Study shall be made based on the results of preliminary work, which include:

  •   Research, analysis, designs and other expert material;
  • Obtaining data for analysis and development of engineering, geological, geotechnical, geodesic, hydrological, meteorological, urban planning, technical, technological, economy, energy, seismic, water management, and traffic conditions;
  • Obtaining conditions for environmental and social aspects;
  • Obtaining other conditions that affect the construction and use of a particular facility. The Environmental and Social Impact Assessment (ESIA) will: • allow consideration and subsequent decision-making on the appropriateness of the preconstruction, construction, operation and decommissioning of the proposed DH pipeline project;

identify the main types of potentially significant adverse and beneficial impacts associated with the project that will require further consideration and more detailed assessment during the subsequent ESIA process and to set out the scope for any primary or secondary baseline data requirements and assessment methodologies for determining the significance of those impacts.

 

2006- ongoing

AEK-group

 

Reference:

Fahrush Azemi, owner, manager,

+38349115324,

azemi [email protected]

Managing Director

Types of activities:

 

Managing and   implementing   different   projects   to   improve   the   best performance of Energy Efficiency of buildings, ESIA report for: administrative and residential buildings, schools, and health facilities, industrial and other facilities. These projects are implemented by various investore: Private sectors, Government, Municipalities, EU office in Pristina, US Army, World Bank, EBRD etc.

 

Dec /2020-

March /   2021

HPC international SAS and Earth Active

Reference:

Mimoza Dugolli, manager;

e-mail: mimoza.dugolli@hpc- international.com

mob: +38345898987

Energy Auditor and Environmental Expert

Assignment:

Prizren Public Buildings Energy Efficiency Project - Category B. Environmental and Social Assessment, EBRD

Types of activities:

  • Conducted an Environmental and Social Assessment of the project's impacts and benefits in line with the EBRD Environmental and Social Policy (ESP)
  • Developed a Stakeholder Engagement Plan to ensure effective communication and collaboration with all relevant parties
  • Prepared the Environmental and Social Action Plan (ESAP) to address identified environmental and social risks
  • Created the Environmental and Social Management Plan (ESMP) for construction and refurbishment activities, integrating these plans into the Client's existing management systems and operations
  • Coordinated and ensured compliance with the local Environmental Impact Assessment (EIA), including public consultation and disclosure, in accordance with local and national legal and permitting requirements

Jan /2020-

Jun / 2022

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Model Slovenia Invest SH.P.K

Reference:

Afrim Tafa, Head of company.

email: [email protected]

mob:0038348545554

 

Project Manager / Architect Engineer
 

Assignment:

 

Residential Apartment Complex, 22,000 m² – MAT, Prishtina

 

Types of activities:

  • Led the design of the entire complex, covering all architectural phases, including architectural design, structural calculations, water & sewage installations, electrical systems, HVAC, and building physics
  • Managed the process of obtaining the building permit from the Municipality of Prishtina
  • Prepared the Municipal Environmental Permit Report, including:
  • Legal framework and methodology for drafting the report
  • Description of the location and environmental baseline
  • Overview of the buildings and technological processes
  • Environmental impact assessment covering air, water, and soil pollution; noise; and effects on flora and fauna

 

 

Dec/2019-

Oct/2022

Model Slovenia SH.P.K

Reference:

Afrim Tafa, Head of company.

email:[email protected]

mob:0038348545554

 

Project Manager / Architect Engineer

Assignment:

 

Residential Apartment Complex, 16,000 m² – KALABRIA, Prishtina

 

Types of activities:

  • Led the full design process: architectural, structural, HVAC, electrical, water & sewage systems, and building physics
  • Managed the process of obtaining the building permit from the Municipality of Prishtina
  • Prepared the Municipal Environmental Permit Report, including environmental impact assessment and mitigation measure

 

Jun / 2019-

Oct / 2019

ELSAM sh.p.k

Reference: Saranda Musliu, Head of company

email:[email protected]m

 

Project Manager-Pristina

Environmental Expert EBRD

 

Assignment:

EBRD – grant for ELSAM sh.p.k.

 

Types of activities:

Feasibility Study for Energy Efficiency and Implementation of Measures at the Industrial Facility, EIA report - Environmental evaluation (present and future energy sources, Emissions, and other environmental impacts as noise). The survey includes collection of information regarding energy consumption, on site visit, measurements for proposed of analyzing energy consumption patterns, identification of energy saving measures, assessing energy saving potential, this through the process of: Identification of production process throughout the facility; Identification of major components (measuring points, control system, production line, layout, luminaires); Inventory of energy consuming and base line calculation; Analysis of energy consumption by type of machine, production line process, and each equipment; Analysis of energy efficiency measures identified, investment cost estimation, energy saving potential and operational cost saving; Identification of the retrofit or control measures including recommendation for intervention in order to improve operational performance of audited installation.

 

Jul / 2019-

Apr /2020

 

NOVUS consulting and CSP

Reference: Pleurat Halili [email protected]

 

ESIA    and     Urban Landscape – expert

Assignment:

Prepared the report of the Environmental and Social Impact Assessment - ESIA

Types of activities:

 

Development of an Irrigation Master Plan and Investment Framework for Kosovo Agriculture and Rural Development Project (KARDP) ESIA Report and Landscape Design

 

Oct /2018 -

July /2019

Lesna SH.P.K; US army

Reference: Bekim Deshishku, head of company. [email protected]

+38344104104

 

Architect – manager, architect&Energy Efficiency expert.

 

Assignment:

Detailed design of Renovation for primary school “Adem Gllavica”in Lipjan. Energy Efficiency measures, S= 4307. 0 m², according to US Army    tender based on SOW.

 

Types of activities:

Development of the detail designs for the project, identifications of hazardous materials, such is: Asbestos, mercury lamps etc. Responsible for: Detail Design - Architecture phase, preparation of Bill of Quantities, General description, Technical specification, inventory of hazardous materials. Energy Efficiency measures have been taken, such as: EE measures in the building envelope, thermal insulation facades, replacement of doors and windows, insulation of the roofs, renovation of the interior, sanitary joints etc.

 

Apr/ 2014-

March / /  2016

 

World Bank & Ministry of  Economic Development & Government of Kosovo

 

Reference: Naim Bujupi, PIU manager

[email protected]

 

PIU - Environmental specialist

Assignment:

 

Kosovo Energy Efficiency and Renewable Energy project

 

Types of activities:

 

Responsible for treatment of hazardous materials such is: Asbestos, Mercury lamps. Corporation with the MESP: Responsible for document preparation Framework for the Environmental Management for Hazardous Materials – FEM, Disposal of asbestos containing materials, Treatment of asbestos at the construction/demolition site, Disposal of lead containing dust from removed paint. Disposal of spent compact fluorescent lamps (CFL).

 

Feb/ 2016-

Mar/ 2018

Eptisa & Novus consulting,

 

European Union Office

Reference:

Reinhard Knop , team lider  e- mail:     [email protected];

Architect local Expert Supervisor, Key expert

Assignment:

 

“Supervision of Construction and supplies for category I Rendering plant and Administrative Building”.

 

Types of activities:

Supervision of construction works for administrative building; Supervision of construction and infrastructure works for the rendering plant and administrative building; Supervision of supply equipment for rendering

plant and administrative building. Supervision of Environmental issues such is: Waste water treatment plant and process of work based on Environmental low in Kosovo and EU legislation.

Investor: EU office and Government of Kosovo.

 

May/2018 – Jul/2018

F&A Inxhiniering

Reference: Afrim Zejnullahu,

Head of Comp.

email: [email protected]

tel:+38349135659

Kosovo

Project manager, architect

Assignment:

 

Design, supervision and managing project of residential building with 12 000 m2 in ‘Prishtina e Re’ neighborhood, west area, Prishtina. construction company.

 

Types of activities:

 

Prepared MUNICIPAL ENVIRONMENTAL PERMIT REPORT. Legal basis for drafting   the   report.   Work   methodology΄Description   of   location   and environment   baseline΄Description   of   the   buildings   and   technological process. Environmental impact report for municipal environmental permit. Air pollution; Water pollution; Soil pollution; Noise; Effects on flora and fauna (Plants and Animals). ENVIRONMENTAL PROTECTION MEASURES

 

2018-2019

District Heating Gjakova

Position: ESIA lead

Reference:   Albana  Skivjani,

Acting CEO of Gjakova district

heating.

Albana.skivjani@ngrohtore

 

 

ESIA Lead

Assignment:

 

ESIA Report for District Heating with biomass in Gjakova

 

Types of activities:

 

Responsible for preparing study report of Impact Assessment Social and

Environmental Feasibility Study and ESIA about the change of fuel for

Rehabilitation of the Central Heating System (Heating) in Gjakova.

Non-Technical Approval Rating with Social and Environmental Impact. IPA2011-Infrastructure-Assistance-Project for Western Balkans countries- Technical Assistance 3 Help from Europe/ 131160/C/SER/ MULTI/3C December 2017. IPA 2011-WBIF Infrastructure Project Facility-Technical Assistance3 Europe /131160/C/SER/MULTI/3C. Public Company Organized public debate with the community and different stakeholders for EIA report.

 

Apr/2011- Mar/2013

Ferizaj Municipality, Kosovo

Reference: Hanife Obrazhda Selimi procurement official Email:[email protected]

 

Types of activities:

 

Manager architect, supervision and responsible for the team of engineers. Ferizaj Municipality, Design projects, prepared bidding documents, of health facilities implementing remedial works in school and health buildings in the region of Municipality of Ferizaj, Measures for Energy Efficiency. Have been made repairs and total renovations windows, facade, roofs etc. of the school buildings.

 

Jul/2009-Aug/2010

Ministry of Internal Affairs – Gov.Kos

Reference:      Fatmir    Thaqi, procurement director.

Emai: [email protected]

+38349883017

 

N/A

Assignment:

Framework contract

 

Types of activities:

Development of the detailed designs and supervision for the projects of facilities for the needs of Ministry of Internal Affairs. Responsible for: Detail Design-all phases (Architecture, Static, Hidro, electronic, HAVC, infrastructure); Preparation of Bill of Quantities, General description, technical specification.

Supervision, control of materials, to Technical Acceptance. Have been designed and supervised listed of buildings below:

-Civil Registration Agency in Pristina -Civil Registration center in Gjilan-Civil

Registration center in Lipjan-Civil Registration center in Viti-Civil Registration center in Klina-Civil Registration center in Drenas

 

Jun/2010

Ministry of Internal Affairs

Gov.Kos.

Investor:

EU Office in Kosovo

Reference: Fatmir Thaqi,

procurement director.

Emai: fatmir.thaqi@rks- gov.net

+38349883017

Architect

Assignment:

 

Supply of inventory and equipment for the needs of of the

Ministry of the Interior, EuropeAid/128980/D/SUP/XK

 

Types of activities:

 

Prepared Design, technical description, Bill of Quantities (BOQ)

 

Jul/2010-Nov/2011

Kosovo Centre for Public

Security,      Education   and

Development

Reference:      Tefik    Salihu,

procurement director

[email protected]

Project Manager

Assignment:

 

Polygon for shooting exercise

 

Types of services:

 

Detail Design & Supervision-all phases (Architecture, Static, Hidro, electronic, HAVC, infrastructure).

Preparation of Bill of Quantities, General description, technical specification.

Supervision, control of materials, to Technical Acceptance

 

Jun/2008-Oct/2009

Ministry of Internal Affairs –

Gov.Kos

 

Reference: Fatmir Thaqi, procurement director.

Email: [email protected]

Architect Manager

Types of services:

 

Supervision, quality control of materials, Technical Acceptance of Civil

Registration center in Shtime and Kamenica municipality.

 

Oct/2007-Dec/2008

Municipality of Pristina

Reference: Ekrem Rexha

[email protected].

Architect Manager

Types of activities:

 

Detail Design & Supervision-all phases (Architecture, Static, Hidro, electronic, HAVC, infrastructure).

Preparation of Bill of Quantities, General description, technical specification. Supervision, control of materials, to Technical AcceptanceSupervision of Elementary school “Lagjja e Vreshtave” in Pristina

 

Jun/2006-Jul/2007

Private investitor, Xhelal Idrizaj

Reference: Xhelal Idrizaj

[email protected]

tel:0038344100450

Architect Manager

Assignment:

 

The Project Design & Supervision of Norwegian and Finland

 

Types of activities:

 

Embassy in Pristina. Preparation of Bill of Quantities, General description, technical specification.

Supervision, quality control of materials to Technical Acceptance

 

Nov/2004-Dec/2005

Municipality of Pristina

Reference: Ekrem Rexha [email protected].

Architect, ACT

Types of activities:

 

The project of public garage in front of the University Clinical Center in Pristina - 40,000 m2

The project of the Kinder Garden “GëzimiYnë” in Pristine

 

Mar/2001-Jun/2003

Private, Besnik Ramadani

Reference: Besnik Ramadani [email protected]

 

Architect

Assignment:

 

The Project Design & Supervision of Switzerland and France Embassy in Prishtina

 

           

 

 

OTHER INFORMATION

  • Membership in Professional Associations and Publications: Associations of Architects of Kosovo (AAK) - Kosovo
  • Membership of the Chamber of Architects of Kosovo."

 


With respect: Fahrush Azemi Msc.Arch